Source author record

Ian Wisher

Ian Wisher appears in the imported research catalog. Authorship, coauthor and topic links are available while profile ownership is still unclaimed.

ResearcherUnclaimed source record

Catalog footprint

What is connected

2works
5topics
4close collaborators

Actions

Connect this record

Log in to claim

Research graph

See the researcher in context

Open full explorer

Inspect adjacent papers, topics, institutions and collaborators without losing the researcher page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

2 published item(s)

preprint2019arXiv

Developing a silica aerogel radiator for the HELIX ring-imaging Cherenkov system

This paper reports the successful fabrication of silica aerogel Cherenkov radiators produced in the first batches from a 96-tile mass production performed using pin-drying technique in our laboratory. The aerogels are to be used in a ring-imaging Cherenkov detector in the spectrometer of a planned balloon-borne cosmic-ray observation program, HELIX (High Energy Light Isotope eXperiment). A total of 36 transparent, hydrophobic aerogel tiles with a high refractive index of 1.16 and dimensions of 10 cm $\times $ 10 cm $\times $ 1 cm will be chosen as the flight radiators. Thus far, 40 out of the 48 tiles fabricated were confirmed as having no tile cracking. In the first screening, 8 out of the first 16 tiles were accepted as flight-qualified candidates, based on basic optical measurement results. To fit the aerogel tiles into a radiator support structure, the trimming of previously manufactured prototype tiles using a water-jet cutting device was successful.

preprint2014arXiv

GPS Timing and Control System of the HAWC Detector

The design and performance of the GPS Timing and Control (GTC) System of the High Altitude Water Cerenkov (HAWC) gamma ray observatory is described. The GTC system provides a GPS synchronized absolute timestamp, with an accuracy better than 1$μ$s, for each recorded event in HAWC. In order to avoid any slack between the recorded data and the timestamp, timestamps are injected to the main data acquisition (DAQ) system after the Front-end Electronic Boards (FEBs). When HAWC is completed, the HAWC main DAQ will use 10 time to digital converters (TDCs). In order to keep all the TDCs in sync, the GTC system provides a synchronized clock signal, coordinated trigger signal, and control signals to all TDCs.