Source author record

I. Köseoglu

I. Köseoglu appears in the imported research catalog. Authorship, coauthor and topic links are available while profile ownership is still unclaimed.

ResearcherUnclaimed source record

Catalog footprint

What is connected

2works
1topics
4close collaborators

Actions

Connect this record

Log in to claim

Research graph

See the researcher in context

Open full explorer

Inspect adjacent papers, topics, institutions and collaborators without losing the researcher page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

2 published item(s)

preprint2021arXiv

The PANDA DIRCs

The PANDA experiment at the FAIR facility adresses open questions in hadron physics with antiproton beams in the momentum range of 1.5-15 GeV/c. The antiprotons are stored and cooled in a High Energy Storage RING (HESR) with a momentum spread down to Dp/p = 4*10^-5. A high luminosity of up to 2*10^32 cm-2 s-1 can be achieved. An excellent hadronic particle identification (PID) will be provided by two Cherenkov detectors using the priciple of Detection of Internally Reflected Cherenkov light (DIRC). In the forward direction from polar angles of 5 degree to 22 degree, the Endcap Disc DIRC (EDD) separates pions from kaons up to momenta of 4 GeV/c. Between 22 degree and 140 degree the Barrel DIRC cleanly separates pions from kaons for momenta up to 3.5 GeV/c. This article describes the design of the Barrel DIRC and of the Endcap Disc DIRC and the validation of their designs in particle beams at the CERN PS.

preprint2020arXiv

Status of the PANDA Barrel DIRC

The PANDA experiment will use cooled antiproton beams with high intensity stored1 in the High Energy Storage Ring at FAIR. Reactions on a fixed target producing charmed hadrons will shed light on the strong QCD. Three ring imaging Cherenkov counters are used for charged particle identification. The status of the Barrel DIRC (Detection of Internally Reflected Cherenkov light) is described. Its design is robust and its performance validated in experiments with test beams. The PANDA Barrel DIRC has entered the construction phase and will be installed in 2023/2024.