Researcher profile

G. Petkov

G. Petkov contributes to research discovery and scholarly infrastructure.

ResearcherAffiliation not importedOpen to collaborate

Trust snapshot

Quick read

Trust 13 - UnverifiedVerification L1Unclaimed author
2works
0followers
3topics
4close collaborators

Actions

Decide how to stay connected

Follow researcher0

Identity and collaboration

How to connect with this researcher

Claiming links this public author record to a researcher profile and unlocks direct collaboration workflows.

Log in to claim

Direct collaboration

Open a focused conversation when the fit is right

Claim this author entity first to unlock direct invitations.

Research graph

See the researcher in context

Open full explorer

Inspect adjacent work, topics, institutions and collaborators without jumping out to a separate graph page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

2 published item(s)

preprint2022arXiv

The European Spallation Source neutrino Super Beam

In this Snowmass 2021 white paper, we summarise the Conceptual Design of the European Spallation Source neutrino Super Beam (ESSvSB) experiment and its synergies with the possible future muon based facilities, e.g. a Low Energy nuSTORM and the Muon Collider. The ESSvSB will benefit from the high power, 5 MW, of the European Spallation Source (ESS) LINAC in Lund-Sweden to produce the world most intense neutrino beam, enabling measurements to be made at the second oscillation maximum. Assuming a ten-year exposure, physics simulations show that the CP-invariance violation can be established with a significance of 5 sigma over more than 70% of all values of delta CP and with an error in the measurement of the delta CP angle of less than 8 degree for all values of delta CP. However, several technological and physics challenges must be further studied before achieving a final Technical Design. Measuring at the 2nd oscillation maximum necessitates a very intense neutrino beam with the appropriate energy. For this, the ESS proton beam LINAC, which is designed to produce the world's most intense neutron beam, will need to be upgraded to 10 MW power, 2.5 GeV energy and 28 Hz beam pulse repetition rate. An accumulator ring will be required for the compression of the ESS LINAC beam pulse from 2.86 ms to 1.3 mus. A high power target station facility will be needed to produce a well-focused intense (super) mu-neutrino beam. The physics performance of that neutrino Super Beam in conjunction with a megaton underground Water Cherenkov neutrino far detector installed at a distance of either 360 km or 540 km from the ESS, the baseline, has been evaluated.

preprint2020arXiv

The SuperFGD Prototype Charged Particle Beam Tests

A novel scintillator detector, the SuperFGD, has been selected as the main neutrino target for an upgrade of the T2K experiment ND280 near detector. The detector design will allow nearly 4π coverage for neutrino interactions at the near detector and will provide lower energy thresholds, significantly reducing systematic errors for the experiment. The SuperFGD is made of optically-isolated scintillator cubes of size 10x10x10 mm^3, providing the required spatial and energy resolution to reduce systematic uncertainties for future T2K runs. The SuperFGD for T2K will have close to two million cubes in a 1920x560x1840 mm^3 volume. A prototype made of 24x8x48 cubes was tested at a charged particle beamline at the CERN PS facility. The SuperFGD Prototype was instrumented with readout electronics similar to the future implementation for T2K. Results on electronics and detector response are reported in this paper, along with a discussion of the 3D reconstruction capabilities of this type of detector. Several physics analyses with the prototype data are also discussed, including a study of stopping protons.