Source author record

G F Matthews

G F Matthews appears in the imported research catalog. Authorship, coauthor and topic links are available while profile ownership is still unclaimed.

ResearcherUnclaimed source record

Catalog footprint

What is connected

2works
2topics
4close collaborators

Actions

Connect this record

Log in to claim

Research graph

See the researcher in context

Open full explorer

Inspect adjacent papers, topics, institutions and collaborators without losing the researcher page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

2 published item(s)

preprint2014arXiv

Surface analysis of tiles and samples exposed to the first JET campaigns with the ITER-Like Wall

This paper reports on the first post-mortem analyses of tiles removed from JET after the first campaigns with the ITER-like Wall (ILW) during 2011-2 [1]. Tiles from the divertor have been analysed by the Ion Beam Analysis (IBA) techniques Rutherford Backscattering Spectroscopy (RBS) and Nuclear Reaction Analysis (NRA) and by Secondary Ion Mass Spectrometry (SIMS) to determine the amount of beryllium deposition and deuterium retention in the tiles exposed to the scrape-off layer. Films 10-20 microns thick were present at the top of Tile 1, but only very thin films (<1 micron) were found in the shadowed areas and on other divertor tiles. The total amount of Be found in the divertor following the ILW campaign was a factor of ~9 less that the material deposited in the 2007-9 carbon campaign, after allowing for the longer operations in 2007-9.

preprint2013arXiv

Design, manufacture and initial operation of the beryllium components of the JET ITER-like wall

The aim of the JET ITER-like Wall Project was to provide JET with the plasma facing material combination now selected for the DT phase of ITER (bulk beryllium main chamber limiters and a full tungsten divertor) and, in conjunction with the upgraded neutral beam heating system, to achieve ITER relevant conditions. The design of the bulk Be plasma facing components had to be compatible with increased heating power and pulse length, as well as to reuse the existing tile supports originally designed to cope with disruption loads from carbon based tiles and be installed by remote handling. Risk reduction measures (prototypes, jigs, etc) were implemented to maximize efficiency during the shutdown. However, a large number of clashes with existing components not fully captured by the configuration model occurred. Restarting the plasma on the ITER-like Wall proved much easier than for the carbon wall and no deconditioning by disruptions was observed. Disruptions have been more threatening than expected due to the reduced radiative losses compared to carbon, leaving most of the plasma magnetic energy to be conducted to the wall and requiring routine disruption mitigation. The main chamber power handling has achieved and possibly exceeded the design targets.