Researcher profile

Fritz Caspers

Fritz Caspers contributes to research discovery and scholarly infrastructure.

ResearcherAffiliation not importedOpen to collaborate

Trust snapshot

Quick read

Trust 21 - EmergingVerification L1Unclaimed author
7works
0followers
4topics
4close collaborators

Actions

Decide how to stay connected

Follow researcher0

Identity and collaboration

How to connect with this researcher

Claiming links this public author record to a researcher profile and unlocks direct collaboration workflows.

Log in to claim

Direct collaboration

Open a focused conversation when the fit is right

Claim this author entity first to unlock direct invitations.

Research graph

See the researcher in context

Open full explorer

Inspect adjacent work, topics, institutions and collaborators without jumping out to a separate graph page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

7 published item(s)

preprint2012arXiv

Beam Coupling Impedance of the LHC TCTP Collimators

As part of an upgrade to the LHC collimation system, 8 TCTP and 1 TCSG collimators are proposed to replace existing collimators in the collimation system. In an effort to review all equipment placed in the accelerator complex for potential side effects due to collective effects and beam-equipment interactions, beam coupling impedance simulations are carried out in both the time-domain and frequency-domain of the full TCTP design. Particular attention is paid to trapped modes that may induce beam instabilities and beam-induced heating due to cavity modes of the device.

preprint2012arXiv

Evaluation of the Beam Coupling Impedance of New Beam Screen Designs for the LHC Injection Kicker Magnets

During the 2011 run of the LHC there was a significant measured temperature increase in the LHC Injection Kicker Magnets (MKI) during operation with 50ns bunch spacing. This was due to increased beam-induced heating of the magnet due to beam impedance. Due to concerns about future heating with the increased total intensity to nominal and ultimate luminosities a review of the impedance reduction techniques within the magnet was required. A number of new beam screen designs are proposed and their impedance evaluated. Heating estimates are also given with a particular attention paid to future intensity upgrades to ultimate parameters.

preprint2012arXiv

LARP LHC 4.8 GHZ Schottky System Initial Commissioning with Beam

The LHC Schottky system consists for four independent 4.8 GHz triple down conversion receivers with associated data acquisition systems. Each system is capable of measuring tune, chromaticity, momentum spread in either horizontal or vertical planes; two systems per beam. The hardware commissioning has taken place from spring through fall of 2010. With nominal bunch beam currents of 1011 protons, the first incoherent Schottky signals were detected and analyzed. This paper will report on these initial commissioning results. A companion paper will report on the data analysis curve fitting and remote control user interface of the system.

preprint2011arXiv

Coaxial Wire Measurements of Ferrite Kicker Magnets

Fast kicker magnets are used to inject beam into and eject beam out of the CERN accelerator rings. These kickers are generally transmission line type magnets with a rectangular shaped aperture through which the beam passes. Unless special precautions are taken the impedance of the yoke can provoke significant beam induced heating, especially for high intensities. In addition the impedance may contribute to beam instabilities. The results of longitudinal and transverse impedance measurements, for various kicker magnets, are presented and compared with analytical calculations: in addition predictions from a numerical analysis are discussed.

preprint2011arXiv

Comparison of the current LHC Collimators and the SLAC Phase 2 Collimator Impedances

One of the key sources of transverse impedance in the LHC has been the secondary graphite collimators that sit close to the beam at all energies. This limits the stable bunch intensity due to transverse coupled-bunch instabilities and transverse mode coupling instability. To counteract this, new secondary collimators have been proposed for the phase II upgrade of the LHC collimation system. A number of designs based on different jaw materials and mechanical designs have been proposed. A comparison of the beam coupling impedance of these different designs derived from simulations are presented, with reference to the existing phase I secondary collimator design.

preprint2011arXiv

Prospects for Searching Axion-like Particle Dark Matter with Dipole, Toroidal and Wiggler Magnets

In this work we consider searches for dark matter made of axions or axion-like particles (ALPs) using resonant radio frequency cavities inserted into dipole magnets from particle accelerators, wiggler magnets developed for accelerator based advanced light sources, and toroidal magnets similar to those used in particle physics detectors. We investigate the expected sensitivity of such ALP dark matter detectors and discuss the engineering aspects of building and tuning them. Brief mention is also made of even stronger field magnets that are becoming available due to improvements in magnetic technology. It is concluded that new experiments utilizing already existing magnets could greatly enlarge the mass region in searches for axion-like dark matter particles.

preprint2011arXiv

Simulations of Coaxial Wire Measurements of the Impedance of Asymmetric Structures

Coaxial wire measurements have provided a simple and effective way to measure the beam coupling impedance of accelerator structures for a number of years. It has been known how to measure the longitudinal and dipolar transverse impedance using one and two wires for some time. Recently the ability to measure the quadrupolar impedance of structures exhibiting top/bottom and left/right symmetry has been demonstrated. A method for measuring the beam coupling impedance of asymmetric structures using displaced single wires and two wire measurements is proposed. Simulations of the measurement system are presented with further work proposed.