Source author record

E. Harms

E. Harms appears in the imported research catalog. Authorship, coauthor and topic links are available while profile ownership is still unclaimed.

ResearcherUnclaimed source record

Catalog footprint

What is connected

9works
3topics
4close collaborators

Actions

Connect this record

Log in to claim

Research graph

See the researcher in context

Open full explorer

Inspect adjacent papers, topics, institutions and collaborators without losing the researcher page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

9 published item(s)

preprint2022arXiv

Experience With Machine Protection Systems At PIP2IT

The PIP-II Injector Test 1 PIP2IT facility accelerator was assembled in multiple stages in 2014 $-$ 2021 to test concepts and components of the future PIPII linac that is being constructed at Fermilab. In its final configuration, PIP2IT accelerated a 0.55 ms x 20 Hz x 2 mA H$-$ beam to 16 MeV. To protect elements of the beam line, a Machine Protection System MPS was implemented and commissioned. The beam was interrupted faster than 10$μ$s when excessive beam loss was detected. The paper describes the MPS architecture, methods of the loss detection, procedure of the beam interruption, and operational experience at PIP2IT.

preprint2022arXiv

LCLS-II and HE Cryomodule Microphonics at CMTF in Fermilab*

Microphonics causes the cavity to detune. This study discusses the microphonics of sixteen 1.3 GHz cryomodules, 14 for LCLS-II and 2 for LCLS-II HE tested at CMTF. The peak detuning, as well as the RMS detuning for each cryomodule, will be discussed. For each cryomodule, the data was taken with enough soaking time to prevent any thermalization effects which can show up in the detuning. Each data capture taken was 30 minutes or longer and sampled at 1 kHz.

preprint2020arXiv

Upgrade of the ILC cryomodule

Results of testing modified components for the cryomodule of the International Linear Collider (ILC) are summarized. To reduce the ILC project cost, it is proposed to replace titanium cryomodule components with stainless steel (SS) ones. New bimetallic transitions Ti_SS, Nb_SS have been produced by a unique method based on explosion welding. Successive upgrading of these components to the latest version of the Nb/Ti/SS transition element has led to improvement of the ILC cryomodule. This new component resolves problems of residual stress, and its specific design prevents the possibility of a shift due to the difference in the linear expansion coefficients of the constituent metals. Leak tests with the He gas revealed no leaks at the background rate of 0.2x10-10atmxcc-1s. The test results are very encouraging. The up-to-date design of trimetallic Nb_Ti_SS element promises technologically simpler and less expensive manufacture. Investigations have shown that explosion welding allows unique trimetallic components to be made not only for cryogenic units of accelerators but also for laboratory equipment and for general engineering applications.

preprint2016arXiv

Investigation of thermal acoustic effects on SRF cavities within CM1 at Fermilab

Radio Frequency (RF) power studies are in progress following the cryogenic commissioning of Cryomodule #1 (CM1) at Fermilab's Superconducting Radio Frequency (SRF) Accelerator Test Facility. These studies are complemented by the characterization of thermal acoustic effects on cavity microphonics manifested by apparent noisy boiling of helium involving vapor bubble and liquid vibration. The thermal acoustic measurements also consider pressure and temperature spikes which drive the phenomenon at low and high frequencies.

preprint2013arXiv

Test Results of Tesla-Style Cryomodules at Fermilab

Commissioning and operation of the first Tesla-style Cryomodule (CM-1) at Fermilab was concluded in recent months. A second Tesla Type III+ module, RFCA002, will be replacing it. CM-1 is the first 8-cavity ILC style cryomodule to be built at Fermilab and also the first accelerating cryomodule of the Advanced Superconducting Test Accelerator (ASTA). We report on the operating results of both of these cryomodules.

preprint2012arXiv

Recent advances in Ti and Nb explosion welding with stainless steel for 2K operating (ILC Program)- To the proceedings of LCWS11

The world first samples 0f Ti+SS and Nb+SS joints were manufactured by an explosion welding technology demonstrating a high mechanic properties and leak absence at 4.6 x 10^{-9} atm-cc/sec. Residual stresses in bimetallic joints resulting from explosion welding measured by neutron diffraction method are quite high (~1000 MPa). Thermal tempering of explosion welded Ti+SS and Nb+SS specimens leads to complete relaxation of internal stresses in Ti,Nb and Stainless steel and makes the transition elements quite serviceable.

preprint2012arXiv

Status and plans for a SRF accelerator test faciliy at Fermilab

A superconducting RF accelerator test facility is being constructed at Fermilab. The existing New Muon Lab (NML) building is being converted for this facility. The accelerator will consist of an electron gun, injector, beam acceleration section consisting of 3 TTF-type or ILC-type cryomodules, multiple downstream beam lines for testing diagnostics and conducting various beam tests, and a high power beam dump. When completed, it is envisioned that this facility will initially be capable of generating an 810 MeV electron beam with ILC beam intensity. Expansion plans of the facility are underway that will provide the capability to upgrade the accelerator to a total beam energy of 1.5 GeV. In addition to testing accelerator components, this facility will be used to test RF power equipment, instrumentation, LLRF and controls systems for future SRF accelerators such as the ILC and Project-X. This paper describes the current status and overall plans for this facility.

preprint2012arXiv

Superfluid helium testing of a stainless steel to titanium piping transition joint

Stainless steel-to-titanium bimetallic transitions have been fabricated with an explosively bonded joint. This novel joining technique was conducted by the Russian Federal Nuclear Center, working under contract for the Joint Institute for Nuclear Research. These bimetallic transitions are being considered for use in future superconducting radio-frequency cavity cryomodule assemblies. This application requires cryogenic testing to demonstrate that this transition joint remains leak-tight when sealing superfluid helium. To simulate a titanium cavity vessel connection to a stainless steel service pipe, bimetallic transition joints were paired together to fabricate piping assemblies. These piping assemblies were then tested in superfluid helium conditions at Fermi National Accelerator Laboratory test facilities. The transition joint test program will be described. Fabrication experience and test results will be presented.