Source author record

David Greenwood

David Greenwood appears in the imported research catalog. Authorship, coauthor and topic links are available while profile ownership is still unclaimed.

ResearcherUnclaimed source record

Catalog footprint

What is connected

9works
5topics
4close collaborators

Actions

Connect this record

Log in to claim

Research graph

See the researcher in context

Open full explorer

Inspect adjacent papers, topics, institutions and collaborators without losing the researcher page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

9 published item(s)

preprint2022arXiv

Comparing Generator Unavailability Models with Empirical Distributions from Open Energy Datasets

The modelling of power station outages is an integral part of power system planning. In this work, models of the unavailability of the fleets of eight countries in Northwest Europe are constructed and subsequently compared against empirical distributions derived using data from the open-access ENTSO-e Transparency Platform. Summary statistics of non-sequential models highlight limitations with the empirical modelling, with very variable results across countries. Additionally, analysis of time sequential models suggests a clear need for fleet-specific analytic model parameters. Despite a number of challenges and ambiguities associated with the empirical distributions, it is suggested that a range of valuable qualitative and quantitative insights can be gained by comparing these two complementary approaches for modelling and understanding generator unavailabilities.

preprint2022arXiv

Optimization-based modelling and game-theoretic framework for techno-economic analysis of demand-side flexibility: a real case study

This paper proposes a two-step framework for techno-economic analysis of a demand-side flexibility service in distribution networks. Step one applies optimization-based modelling to propose a generic problem formulation which determines the offer curve, in terms of available flexible capacity and its marginal cost, for flexible distribution-connected assets. These offer curves form an input to the second step, which uses a multi-agent iterative game framework to determine the benefits of demand-side flexibility for the Distribution System Operator (DSO) and the service providers. The combined two-step framework simultaneously accounts for the objectives of each flexibility provider, technical constraints of flexible assets, customer preferences, market clearing mechanisms, and strategic bidding by service providers, omission of any of which can lead to erroneous results. The proposed two-step framework has been applied to a real case study in the North East of England to examine four market mechanisms and three bidding strategies. The results showed that among all considered market mechanisms, flexibility markets that operate under discriminatory pricing, such as pay-as-bid and Dutch reverse auctions, are prone to manipulations, especially in the lack of competition. In contrast, uniform pricing pay-as-cleared auction provides limited opportunities for manipulation even when competition is low.

preprint2021arXiv

Impacts of Heat Decarbonisation on System Adequacy considering Increased Meteorological Sensitivity

This paper explores the impacts of decarbonisation of heat on demand and subsequently on the generation capacity required to secure against system adequacy standards. Gas demand is explored as a proxy variable for modelling the electrification of heating demand in existing housing stock, with a focus on impacts on timescales of capacity markets (up to four years ahead). The work considers the systemic changes that electrification of heating could introduce, including biases that could be introduced if legacy modelling approaches continue to prevail. Covariates from gas and electrical regression models are combined to form a novel, time-collapsed system model, with demand-weather sensitivities determined using lasso-regularized linear regression. It is shown, using a GB case study with one million domestic heat pump installations per year, that the sensitivity of electrical system demand to temperature (and subsequently sensitivities to cold/warm winter seasons) could increase by 50% following four years of heat demand electrification. A central estimate of 1.75 kW additional peak demand per heat pump is estimated, with variability across three published heat demand profiles leading to a range of more than 14 GW in the most extreme cases. It is shown that the legacy approach of scaling historic demand, as compared to the explicit modelling of heat, could lead to over-procurement of 0.79 GW due to bias in estimates of additional capacity to secure. Failure to address this issue could lead to £100m overspend on capacity over ten years.

preprint2011arXiv

Expectations and Reality: Why an enterprise software system didn't work as planned

Over two decades, we and other research groups have found that ethnographic and social analyses of work settings can provide insights useful to the process of system analysis and design. Despite this, ethnographic and social analyses have not been widely assimilated into industry practice. Practitioners tend to address sociotechnical factors in an ad-hoc manner, often post-implementation, once system use or outcome has become problematic. In response to this, we have developed a lightweight qualitative approach to provide insights to ameliorate problematic system deployments. Unlike typical ethnographies and social analyses of work activity that inform systems analysis and design; we argue that analysis of intentional and structural factors to inform system deployment and integration can have a shorter time duration and yet can provide actionable insights. We evaluate our approach using a case study of a problematic enterprise document manage-ment system within a multinational systems engineering organization. Our find-ings are of academic and practical significance as our approach demonstrates that structural-intentional analysis scales to enable the timely analysis of large-scale system deployments.

preprint2011arXiv

Responsibility Modeling for the Sociotechnical Risk Analysis of Coalitions of Systems

Society is challenging systems engineers by demanding ever more complex and integrated systems. With the rise of cloud computing and systems-of-systems (including cyber-physical systems) we are entering an era where mission critical services and applications will be dependent upon 'coalitions-of-systems'. Coalitions-of-systems (CoS) are a class of system similar to systems-of-systems but they differ in that they interact to further overlapping self-interests rather than an overarching mission. Assessing the sociotechnical risks associated with CoS is an open research question of societal importance as existing risk analysis techniques typically focus on the technical aspects of systems and ignore risks associated with coalition partners reneging on responsibilities or leaving the coalition. We demonstrate that a responsibility modeling based risk analysis approach enables the identification of sociotechnical risks associated with CoS. The approach identifies hazards and associated risks that may arise when relying upon a coalition of human/organizational/technical agents to provision a service or application. Through a case study of a proposed cloud IT infrastructure migration we show how the technique identifies vulnerabilities that may arise because of human, organizational or technical agents failing to discharge responsibilities.

preprint2010arXiv

Cloud Migration: A Case Study of Migrating an Enterprise IT System to IaaS

This case study illustrates the potential benefits and risks associated with the migration of an IT system in the oil & gas industry from an in-house data center to Amazon EC2 from a broad variety of stakeholder perspectives across the enterprise, thus transcending the typical, yet narrow, financial and technical analysis offered by providers. Our results show that the system infrastructure in the case study would have cost 37% less over 5 years on EC2, and using cloud computing could have potentially eliminated 21% of the support calls for this system. These findings seem significant enough to call for a migration of the system to the cloud but our stakeholder impact analysis revealed that there are significant risks associated with this. Whilst the benefits of using the cloud are attractive, we argue that it is important that enterprise decision-makers consider the overall organizational implications of the changes brought about with cloud computing to avoid implementing local optimizations at the cost of organization-wide performance.

preprint2010arXiv

Lessons from the Failure and Subsequent Success of a Complex Healthcare Sector IT Project

This paper argues that IT failures diagnosed as errors at the technical or project management level are often mistakenly pointing to symptoms of failure rather than a project's underlying socio-complexity (complexity resulting from the interactions of people and groups) which is usually the actual source of failure. We propose a novel method, Stakeholder Impact Analysis, that can be used to identify risks associated with socio-complexity as it is grounded in insights from the social sciences, psychology and management science. This paper demonstrates the effectiveness of Stakeholder Impact Analysis by using the 1992 London Ambulance Service Computer Aided Dispatch project as a case study, and shows that had our method been used to identify the risks and had they been mitigated, it would have reduced the risk of project failure. This paper's original contribution comprises expanding upon existing accounts of failure by examining failures at a level of granularity not seen elsewhere that enables the underlying socio-complexity sources of risk to be identified.

preprint2010arXiv

The Cloud Adoption Toolkit: Addressing the Challenges of Cloud Adoption in Enterprise

Cloud computing promises a radical shift in the provisioning of computing resource within the enterprise. This paper: i) describes the challenges that decision makers face when attempting to determine the feasibility of the adoption of cloud computing in their organisations; ii) illustrates a lack of existing work to address the feasibility challenges of cloud adoption in the enterprise; iii) introduces the Cloud Adoption Toolkit that provides a framework to support decision makers in identifying their concerns, and matching these concerns to appropriate tools/techniques that can be used to address them. The paper adopts a position paper methodology such that case study evidence is provided, where available, to support claims. We conclude that the Cloud Adoption Toolkit, whilst still under development, shows signs that it is a useful tool for decision makers as it helps address the feasibility challenges of cloud adoption in the enterprise.

preprint2010arXiv

The Cloud Adoption Toolkit: Supporting Cloud Adoption Decisions in the Enterprise

Cloud computing promises a radical shift in the provisioning of computing resource within the enterprise. This paper describes the challenges that decision makers face when assessing the feasibility of the adoption of cloud computing in their organisations, and describes our Cloud Adoption Toolkit, which has been developed to support this process. The toolkit provides a framework to support decision makers in identifying their concerns, and matching these concerns to appropriate tools/techniques that can be used to address them. Cost Modeling is the most mature tool in the toolkit, and this paper shows its effectiveness by demonstrating how practitioners can use it to examine the costs of deploying their IT systems on the cloud. The Cost Modeling tool is evaluated using a case study of an organization that is considering the migration of some of its IT systems to the cloud. The case study shows that running systems on the cloud using a traditional "always on" approach can be less cost effective, and the elastic nature of the cloud has to be used to reduce costs. Therefore, decision makers have to be able to model the variations in resource usage and their systems deployment options to obtain accurate cost estimates.