Researcher profile

Asgeir Tomasgard

Asgeir Tomasgard contributes to research discovery and scholarly infrastructure.

ResearcherAffiliation not importedOpen to collaborate

Trust snapshot

Quick read

Trust 13 - UnverifiedVerification L1Unclaimed author
2works
0followers
3topics
4close collaborators

Actions

Decide how to stay connected

Follow researcher0

Identity and collaboration

How to connect with this researcher

Claiming links this public author record to a researcher profile and unlocks direct collaboration workflows.

Log in to claim

Direct collaboration

Open a focused conversation when the fit is right

Claim this author entity first to unlock direct invitations.

Research graph

See the researcher in context

Open full explorer

Inspect adjacent work, topics, institutions and collaborators without jumping out to a separate graph page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

2 published item(s)

preprint2022arXiv

A stabilised Benders decomposition with adaptive oracles applied to investment planning of multi-region power systems with short-term and long-term uncertainty

Benders decomposition with adaptive oracles was proposed to solve large-scale optimisation problems with a column bounded block-diagonal structure, where subproblems differ on the right-hand side and cost coefficients. Adaptive Benders reduces computational effort significantly by iteratively building inexact cutting planes and valid upper and lower bounds. However, Adaptive Benders and standard Benders may suffer severe oscillation when solving a multi-region investment planning problem. Therefore, we propose stabilising Adaptive Benders with the level set method and adaptively selecting the subproblems to solve per iteration for more accurate information. Furthermore, we propose a dynamic level set method to improve the robustness of stabilised Adaptive Benders by adjusting the level set per iteration. We compare stabilised Adaptive Benders with the unstabilised versions of Adaptive Benders with one subproblem solved per iteration and standard Benders on a multi-region long-term power system investment planning problem with short-term and long-term uncertainty. The problem is formulated as multi-horizon stochastic programming. Four algorithms were implemented to solve linear programming with up to 1 billion variables and 4.5 billion constraints. The computational results show that: a) for a 1.00% convergence tolerance, the proposed stabilised method is up to 113.7 times faster than standard Benders and 2.14 times faster than unstabilised Adaptive Benders; b) for a 0.10% convergence tolerance, the proposed stabilised method is up to 45.5 times faster than standard Benders and unstabilised Adaptive Benders cannot solve the largest instance to convergence tolerance due to severe oscillation and c) dynamic level set method makes stabilisation more robust.

preprint2022arXiv

Welfare compensation in international transmission expansion planning under uncertainty

In transmission expansion planning, situations can arise in which an expansion plan that is optimal for the system as a whole is detrimental to a specific country in terms of its expected economic welfare. If this country is one of the countries hosting the planned capacity expansion, it has the power to veto the plan and thus, undermine the system-wide social optimum. To solve this issue, welfare compensation mechanisms may be constructed that compensate suffering countries and make them willing to participate in the expansion plan. In the literature, welfare compensation mechanisms have been developed that work in expectation. However, in a stochastic setting, even if the welfare effect after compensation is positive in expectation, countries might still be hesitant to accept the risk that the actual, realized welfare effect may be negative in some scenarios. In this paper we analyze welfare compensation mechanisms in a stochastic setting. We consider two existing mechanisms, lump-sum payments and purchase power agreements, and we develop two novel mechanisms, based on the flow through the new transmission line and its economic value. Using a case study of the Northern European power market, we investigate how well these mechanisms succeed in mitigating risk for the countries involved. Using a theoretically ideal model-based mechanism, we show that there is a significant potential for mitigating risk through welfare compensation mechanisms. Out of the four practical mechanisms we consider, our results indicate that a mechanism based on the economic value of the new transmission line is most promising.