Paper detail

Two-Stage Robust Unit Commitment Problem with Complex Temperature and Demand Uncertainties

In this paper, we present and study a robust unit commitment model and some variants that consider complex temperature and demand uncertainties. Since there is a strong relationship among the efficiency of gas generators, demand, and temperature in practical systems, our robust models have both left- and right-hand-side (LHS and RHS, respectively) uncertainties. Unlike many existing robust models with RHS uncertainty only, the introduction of LHS uncertainty imposes a huge challenge in computing robust solutions. For those complex formulations, we analyze their structures, derive important properties, and design exact and fast approximation solution strategies under the column-and-constraint generation framework. Numerical experiments are conducted on typical IEEE test systems, which showcase the great performance of our solution methods and demonstrate a clear impact of complex and correlated uncertainties in system operations.

preprint2022arXivOpen access
0citations
0reviews
0saves
Nocode
Nodataset
0institutions

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.