Paper detail

Tropical optimization problems in time-constrained project scheduling

We consider a project that consists of activities to be performed in parallel under various temporal constraints, which include start-start, start-finish and finish-start precedence relationships, release times, deadlines, and due dates. Scheduling problems are formulated to find optimal schedules for the project with respect to different objective functions to be minimized, such as the project makespan, the maximum deviation from the due dates, the maximum flow-time, and the maximum deviation of finish times. We represent these problems as optimization problems in terms of tropical mathematics, and then solve them by applying direct solution methods of tropical optimization. As a result, new direct solutions of the scheduling problems are obtained in a compact vector form, which is ready for further analysis and practical implementation. The solutions are illustrated by simple numerical examples.

preprint2016arXivOpen access

Signal facts

What is known right now

Open access1 author2 topics

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.