Towards Tight Lower Bounds for Scheduling Problems

preprint2015arXivOpen access

Abstract

We show a close connection between structural hardness for kk-partite graphs and tight inapproximability results for scheduling problems with precedence constraints. Assuming a natural but nontrivial generalisation of the bipartite structural hardness result of Bansal and Khot, we obtain a hardness of 2−ε2-ε for the problem of minimising the makespan for scheduling precedence-constrained jobs with preemption on identical parallel machines. This matches the best approximation guarantee for this problem. Assuming the same hypothesis, we also obtain a super constant inapproximability result for the problem of scheduling precedence-constrained jobs on related parallel machines, making progress towards settling an open question in both lists of ten open questions by Williamson and Shmoys, and by Schuurman and Woeginger. The study of structural hardness of kk-partite graphs is of independent interest, as it captures the intrinsic hardness for a large family of scheduling problems. Other than the ones already mentioned, this generalisation also implies tight inapproximability to the problem of minimising the weighted completion time for precedence-constrained jobs on a single machine, and the problem of minimising the makespan of precedence-constrained jobs on identical parallel machine, and hence unifying the results of Bansal and Khot, and Svensson, respectively.

Explore this paper’s authors, topics and related work.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Reviews 0

Write a reviewWrite

No reviews yet.

Discussion 0

Add a commentWrite

No comments yet.