Paper detail

Topology Construction in RPL Networks over Beacon-Enabled 802.15.4

In this paper, we propose a new scheme that allows coupling beacon-enabled IEEE 802.15.4 with the RPL routing protocol while keeping full compliance with both standards. We provide a means for RPL to pass the routing information to Layer 2 before the 802.15.4 topology is created by encapsulating RPL DIO messages in beacon frames. The scheme takes advantage of 802.15.4 command frames to solicit RPL DIO messages. The effect of the command frames is to reset the Trickle timer that governs sending DIO messages. We provide a detailed analysis of the overhead incurred by the proposed scheme to understand topology construction costs. We have evaluated the scheme using Contiki and the instruction-level Cooja simulator and compared our results against the most common scheme used for dissemination of the upper-layer information in beacon-enabled PANs. The results show energy savings during the topology construction phase and in the steady state.

preprint2014arXivOpen access
0citations
0reviews
0saves
Nocode
Nodataset
0institutions

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.