Throughput-Delay Analysis of Random Linear Network Coding for Wireless Broadcasting

preprint2011arXivOpen access

Abstract

In an unreliable single-hop broadcast network setting, we investigate the throughput and decoding-delay performance of random linear network coding as a function of the coding window size and the network size. Our model consists of a source transmitting packets of a single flow to a set of nn users over independent erasure channels. The source performs random linear network coding (RLNC) over kk (coding window size) packets and broadcasts them to the users. We note that the broadcast throughput of RLNC must vanish with increasing nn, for any fixed k.k. Hence, in contrast to other works in the literature, we investigate how the coding window size kk must scale for increasing nn. Our analysis reveals that the coding window size of Θ(ln⁡(n))Θ(\ln(n)) represents a phase transition rate, below which the throughput converges to zero, and above which it converges to the broadcast capacity. Further, we characterize the asymptotic distribution of decoding delay and provide approximate expressions for the mean and variance of decoding delay for the scaling regime of k=ω(ln⁡(n)).k=ω(\ln(n)). These asymptotic expressions reveal the impact of channel correlations on the throughput and delay performance of RLNC. We also show how our analysis can be extended to other rateless block coding schemes such as the LT codes. Finally, we comment on the extension of our results to the cases of dependent channels across users and asymmetric channel model.

Explore this paper’s authors, topics and related work.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Reviews 0

Write a reviewWrite

No reviews yet.

Discussion 0

Add a commentWrite

No comments yet.