Abstract
Significant beam loss caused by the charge exchange processes and ions impact induced outgassing play a crucial role in the limitation of the maximum number of accumulated heavy ions during the high intensity operation in the accelerators. With the aim to control beam loss due to charge exchange processes and to confine the generated desorption gas, the tracking of the loss positions and installing the absorber blocks with low-desorption rate material at appropriate locations in the CSRm ring will be taken. The loss simulation of U ions having lost an electron will be presented in this report and the calculation of the collimation efficiency of the CSRm ring will be continued in the future.
Connections
Explore this paper’s authors, topics and related work.
Building this map preview
BZPEER is loading the nearby papers, people, topics and institutions for this page.
Reviews 0
Write a review
No reviews yet.
Discussion 0
Add a comment
No comments yet.