Abstract
In this paper we analyze the worst-case performance of a greedy algorithm called Largest-Z-ratio-First for the problem of scheduling unreliable jobs on m parallel machines. Each job is characterized by a success probability and a reward earned in the case of success. In the case of failure, the jobs subsequently sequenced on that machine cannot be performed. The objective is to maximize the expected reward. We show the algorithm provides an approximation ratio of approximately 0.853196, and that the bound is tight.
Connections
Explore this paper’s authors, topics and related work.
Building this map preview
BZPEER is loading the nearby papers, people, topics and institutions for this page.
Reviews 0
Write a review
No reviews yet.
Discussion 0
Add a comment
No comments yet.