Paper detail

The Importance of Continuous Value Based Project Management in the Context of Requirements Engineering

Despite several scientific achievements in the last years, there are still a lot of IT projects that fail. Researchers found that one out of five IT-projects run out of time, budget or value. Major reasons for this failure are unexpected economic risk factors that emerge during the runtime of projects. In order to be able to identify emerging risks early and to counteract reasonably, financial methods for a continuous IT-project-steering are necessary, which as of today to the best of our knowledge are missing within scientific literature.

preprint2013arXivOpen access

Signal facts

What is known right now

Open access2 authors1 topic

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.