This study aims to assist Company leaders and management team in providing more accurate time and cost estimations for future software projects. This paper focuses on analyzing the relationship between project complexity and cost and time overrun. The sample data of around 50 projects are collected from the Changepoint database. The two research hypotheses were defined and tested using statistical techniques. The quantitative analysis includes descriptive analysis and regression modelling. Experimental results show a strong positive linear relationship between project complexity and cost and time overrun. Based on the study outcome, there is a need to focus on the planning phase of complex projects and allocate more time and budget to estimate the completion date and the initial budget of this type of project more accurately.

preprint2022arXivOpen access

Signal facts

What is known right now

Open access2 authors1 topic

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.