Stochastic production planning with regime switching

preprint2021arXivOpen access

Abstract

This paper considers a stochastic production planning problem with regime switching. There are two regimes corresponding to different economic cycles. A factory is planning its production so as to minimize production costs. We analyze this problem through the value function approach. The optimal production is characterized through the solution of an elliptic system of partial differential equations which is shown to have a solution.

Explore this paper’s authors, topics and related work.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Reviews 0

Write a reviewWrite

No reviews yet.

Discussion 0

Add a commentWrite

No comments yet.