Abstract
This paper considers a stochastic production planning problem with regime switching. There are two regimes corresponding to different economic cycles. A factory is planning its production so as to minimize production costs. We analyze this problem through the value function approach. The optimal production is characterized through the solution of an elliptic system of partial differential equations which is shown to have a solution.
Connections
Explore this paper’s authors, topics and related work.
Building this map preview
BZPEER is loading the nearby papers, people, topics and institutions for this page.
Reviews 0
Write a review
No reviews yet.
Discussion 0
Add a comment
No comments yet.