Paper detail

Status of the new Sum-Trigger system for the MAGIC telescopes

MAGIC is a stereoscopic system of two 17m diameter Imaging Air Cherenckov Telescopes (IACTs) for $γ$-ray astronomy. Lowering the energy threshold of IACTs is crucial for the observation of Pulsars, high redshift AGNs and GRBs. A lower threshold compared to conventional digital trigger can be achieved by means of a novel concept, the so called Sum-Trigger, based on the analogue sum of a patch of pixels. The Sum-Trigger principle has been proven experimentally in 2007 by decreasing the energy threshold of the first MAGIC telescope from 55GeV down to 25GeV. The first VHE detection of the Crab Pulsar was achieved due to this low threshold. After the upgrade of the MAGIC I and MAGIC II, a new Sum-Trigger system will be installed in both telescopes in Summer 2013. The expected trigger threshold in stereo mode is about 25$÷$30GeV. It is a an improvement over the existing threshold (about 50GeV) of the digital trigger. We will report about the current status of the project.

preprint2014arXivOpen access

Signal facts

What is known right now

Open access10 authors1 topic

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.