Abstract
In this paper, we consider the slack due-window assignment model and study a single machine scheduling problem of linear time-dependent deteriorating jobs and a deteriorating maintenance activity. The cost for each job consists of four components: earliness, tardiness, window location and window size. The objective is to schedule the jobs and to assign the maintenance activity and due-windows such that the total cost among all the jobs is minimized. A polynomial-time algorithm with the running time not exceeding to give a solution to this problem is introduced, where is the number of jobs.
Connections
Explore this paper’s authors, topics and related work.
Building this map preview
BZPEER is loading the nearby papers, people, topics and institutions for this page.
Reviews 0
Write a review
No reviews yet.
Discussion 0
Add a comment
No comments yet.