Paper detail

Scheduling in Targeted Transient Surveys and a New Telescope for CHASE

We present a method for scheduling observations in small field-of-view transient targeted surveys. The method is based on maximizing the probability of detection of transient events of a given type and age since occurrence; it requires knowledge of the time since the last observation for every observed field, the expected light curve of the event, and the expected rate of events in the fields where the search is performed. In order to test this scheduling strategy we use a modified version of the genetic scheduler developed for the telescope control system RTS2. In particular, we present example schedules designed for a future 50 cm telescope that will expand the capabilities of the CHASE survey, which aims to detect young supernova events in nearby galaxies. We also include a brief description of the telescope and the status of the project, which is expected to enter a commissioning phase in 2010.

preprint2010arXivOpen access
0citations
0reviews
0saves
Nocode
Nodataset
0institutions

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.