Paper detail

Requirements for Interdependent Reserve Types

As renewable energy penetration increases and system inertia levels drop, primary frequency control is becoming a critical concern in relatively small interconnections such as the Electric Reliability Council of Texas (ERCOT). To address this problem ERCOT is implementing a number of market rule changes including the introduction of a new Fast Frequency Response (FFR) reserve type to the electricity market. This FFR reserve type aims to help the traditional Primary Frequency Response (PFR) reserve type in arresting frequency decline in the event of a large generator outage. This paper derives reserve requirements to ensure sufficient reserve to arrest frequency decline before reaching the critical frequency threshold while coupling PFR reserve, FFR reserve, and system inertia. The general reserve requirement places limits on the amount of PFR reserve that can be provided by each unit based on its ramping capabilities. Two such limits are derived from first principles and another is proposed that is capable of accommodating the equivalency ratio introduced in previous work. These PFR reserve limits also provide first principles insight into equivalency ratios, which have only been studied empirically in the past. High-level insights are provided on a large Texas test case.

preprint2020arXivOpen access
0citations
0reviews
0saves
Nocode
Nodataset
0institutions

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.