Planning, Scheduling, and Uncertainty in the Sequence of Future Events

Scheduling in the factory setting is compounded by computational complexity and temporal uncertainty. Together, these two factors guarantee that the process of constructing an optimal schedule will be costly and the chances of executing that schedule will be slight. Temporal uncertainty in the task execution time can be offset by several methods: eliminate uncertainty by careful engineering, restore certainty whenever it is lost, reduce the uncertainty by using more accurate sensors, and quantify and circumscribe the remaining uncertainty. Unfortunately, these methods focus exclusively on the sources of uncertainty and fail to apply knowledge of the tasks which are to be scheduled. A complete solution must adapt the schedule of activities to be performed according to the evolving state of the production world. The example of vision-directed assembly is presented to illustrate that the principle of least commitment, in the creation of a plan, in the representation of a schedule, and in the execution of a schedule, enables a robot to operate intelligently and efficiently, even in the presence of considerable uncertainty in the sequence of future events.

preprint2013arXivOpen access

Signal facts

What is known right now

Open access2 authors1 topic

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.