Paper detail

Petri Net Induced Heuristic Search for Resource Constrained Scheduling

We formulate the Resource-Constrained Project Scheduling Problem (RCPSP) as optimal search over the reachability graph of a Timed Transition Petri Net with Resources, using relative-delay tokens so that scheduling decisions correspond to transition firings in the induced state space. We solve the resulting problem with $A^*$ guided by a heuristic that combines Critical Path and resource-based lower bounds, and prove that it is consistent under our token-based time semantics. Experiments on the PSPLIB benchmarks show that the approach outperforms strong exact Mixed-Integer Linear Programming (MIP) baselines (SCIP, CBC) in both success rate and solve time. Per-instance analysis shows that heuristic search and MIP degrade along independent axes, resource tightness for $A^*$ and formulation size for MIP, with resource strength mediating which solver benefits from scale.

preprint2026arXivOpen access
0citations
0reviews
0saves
Nocode
Nodataset
0institutions

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.