Paper detail

Optimal Deadline Scheduling with Commitment

We consider an online preemptive scheduling problem where jobs with deadlines arrive sporadically. A commitment requirement is imposed such that the scheduler has to either accept or decline a job immediately upon arrival. The scheduler's decision to accept an arriving job constitutes a contract with the customer; if the accepted job is not completed by its deadline as promised, the scheduler loses the value of the corresponding job and has to pay an additional penalty depending on the amount of unfinished workload. The objective of the online scheduler is to maximize the overall profit, i.e., the total value of the admitted jobs completed before their deadlines less the penalty paid for the admitted jobs that miss their deadlines. We show that the maximum competitive ratio is $3-2\sqrt{2}$ and propose a simple online algorithm to achieve this competitive ratio. The optimal scheduling includes a threshold admission and a greedy scheduling policies. The proposed algorithm has direct applications to the charging of plug-in hybrid electrical vehicles (PHEV) at garages or parking lots.

preprint2011arXivOpen access
0citations
0reviews
0saves
Nocode
Nodataset
0institutions

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.