Paper detail

On the Selection of Intermediate Length Representative Periods for Capacity Expansion

As the decarbonization of power systems accelerates, there has been increasing interest in capacity expansion models for their role in guiding this transition. Representative period selection is an important component of capacity expansion modeling, enabling computational tractability of optimization while ensuring fidelity between the representative periods and the full year. However, little attention has been devoted to selecting representative periods longer than a single day. This prevents the capacity expansion model from directly simulating interday energy sharing, which is of key importance as energy generation becomes more variable and storage more important. To this end, we propose a novel method for selecting representative periods of any length. The method is validated using a capacity expansion model and production cost model based on California's decarbonization goals. We demonstrate that the representative period length has a substantial impact in the results of the capacity expansion investment plan.

preprint2024arXivOpen access

Signal facts

What is known right now

Open access4 authors2 topics

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.