Paper detail

On Correlated Defaults and Incomplete Information

In this paper, we study a continuous time structural asset value model for two correlated firms using a two-dimensional Brownian motion. We consider the situation of incomplete information, where the information set available to the market participants includes the default time of each firm and the periodic asset value reports. In this situation, the default time of each firm becomes a totally inaccessible stopping time to the market participants. The original structural model is first transformed to a reduced-form model. Then the conditional distribution of the default time together with the asset value of each name are derived. We prove the existence of the intensity processes of default times and also give the explicit form of the intensity processes. Numerical studies on the intensities of the two correlated names are conducted for some special cases. We also indicate the possible future research extension into three names case by considering a special correlation structure.

preprint2016arXivOpen access

Signal facts

What is known right now

Open access3 authors1 topic

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.