Paper detail

New Torque Reversal and Spin-Up of 4u 1626- 67 Observed by Fermi/GBM and Swift/BAT

After about 18 years of steadily spinning down, the accretion-powered pulsar 4U 1626-67, experienced a torque reversal at the beginning of 2008. For the present study we have used all available Fermi/GBM data since its launch in 2008 June 11 and over 5 yr of hard X-ray Swift/BAT observations (starting from 2004 October up to the present time). This second detected torque reversal is centered near MJD 54500 (2008 Feb 4) and it lasts approximately 150 days. From 2004 up to the end of 2007 4U 1626-67 the spin-down rate decreased at a mean rate of ~ -5.5E-13 Hz s-1 until the source reversed torque again. Since then it has been following a steady spin-up at a mean rate of ~ 5E-13 Hz s-1. In addition, 4U 1626-67 increased its flux simultaneously (a ~2.5 factor). We present detailed long-term timing analysis of this source and a long term spectral hardness ratio study in order to see whether there are spectral changes around this new observed torque reversal.

preprint2009arXivOpen access

Signal facts

What is known right now

Open access5 authors1 topic

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.