Abstract
We consider Multi-User MIMO (MU-MIMO) scheduling in the 3GPP LTE-Advanced (3GPP LTE-A) cellular uplink. The 3GPP LTE-A uplink allows for precoded multi-stream (precoded MIMO) transmission from each scheduled user and also allows flexible multi-user (MU) scheduling wherein multiple users can be assigned the same time-frequency resource. However, exploiting these features is made challenging by certain practical constraints that have been imposed in order to maintain a low signaling overhead. We show that while the scheduling problem in the 3GPP LTE-A cellular uplink is NP-hard, it can be formulated as the maximization of a submodular set function subject to one matroid and multiple knapsack constraints. We then propose constant-factor polynomial-time approximation algorithms and demonstrate their superior performance via simulations.
Connections
Explore this paper’s authors, topics and related work.
Building this map preview
BZPEER is loading the nearby papers, people, topics and institutions for this page.
Reviews 0
Write a review
No reviews yet.
Discussion 0
Add a comment
No comments yet.