Medium-term optimization of pumped hydro storage with stochastic intrastage subproblems

preprint2014arXivOpen access

Abstract

This paper presents a medium-term self-scheduling optimization of pumped hydro storage power plants with detailed consideration of short-term flexibility. A decomposition of the problem into inter- and intrastage subproblems, where the intrastage problems themselves are formulated as multi-stage stochastic programs, allows the detailed consideration of short- term flexibility. The method is presented together with three alter- native approaches, where the short-term flexibility is considered differently: (1) with aggregated peak and off-peak prices, (2) with price duration curves and (3) with deterministic intrastage subproblems. The methods are compared and evaluated in a Monte Carlo operation simulation study. The study is performed on a realistic hydro power plant with consideration of revenue from ancillary services.

Explore this paper’s authors, topics and related work.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Reviews 0

Write a reviewWrite

No reviews yet.

Discussion 0

Add a commentWrite

No comments yet.