Paper detail

Mapping General System Characteristics to Non- Functional Requirements

The Function point analysis (FPA) method is the preferred scheme of estimation for project managers to determine the size, effort, schedule, resource loading and other such parameters. The FPA method by International Function Point Users Group (IFPUG) has captured the critical implementation features of an application through fourteen general system characteristics. However, Non- functional requirements (NFRs) such as functionality, reliability, efficiency, usability, maintainability, portability, etc. have not been included in the FPA estimation method. This paper discusses some of the NFRs and tries to determine a degree of influence for each of them. An attempt to factor the NFRs into estimation has been made. This approach needs to be validated with data collection and analysis.

preprint2010arXivOpen access

Signal facts

What is known right now

Open access2 authors1 topic

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.