Paper detail

Integrated Planning of a Solar/Storage Collective

French regulation allows consumers in low-voltage networks to form collectives to produce, share, and consume local energy under the collective self-consumption framework. A natural consequence of collectively-owned generation projects is the need to allocate production among consumers. In long-term plans, production allocation determines each of the consumers' benefits of joining the collective. In the short-term, energy should be dynamically allocated to reflect operation. This paper presents a framework that integrates long and short-term planning of a collective that shares a solar plus energy storage system. In the long-term planning stage, we maximize the collective's welfare and equitably allocate expected energy to each consumer. For operation, we propose a model predictive control algorithm that minimizes short-term costs and allocates energy to each consumer on a 30-minute basis (as required by French regulation). We adjust the energy allotment ex-post operation to reflect the materialization of uncertainty. We present a case study where we showcase the framework for a 15 consumer collective.

preprint2020arXivOpen access
0citations
0reviews
0saves
Nocode
Nodataset
0institutions

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.