Paper detail

(In-)Approximability Results for Interval, Resource Restricted, and Low Rank Scheduling

We consider variants of the restricted assignment problem where a set of jobs has to be assigned to a set of machines, for each job a size and a set of eligible machines is given, and the jobs may only be assigned to eligible machines with the goal of makespan minimization. For the variant with interval restrictions, where the machines can be arranged on a path such that each job is eligible on a subpath, we present the first better than $2$-approximation and an improved inapproximability result. In particular, we give a $(2-\frac{1}{24})$-approximation and show that no better than $9/8$-approximation is possible, unless P=NP. Furthermore, we consider restricted assignment with $R$ resource restrictions and rank $D$ unrelated scheduling. In the former problem, a machine may process a job if it can meet its resource requirements regarding $R$ (renewable) resources. In the latter, the size of a job is dependent on the machine it is assigned to and the corresponding processing time matrix has rank at most $D$. The problem with interval restrictions includes the 1 resource variant, is encompassed by the 2 resource variant, and regarding approximation the $R$ resource variant is essentially a special case of the rank $R+1$ problem. We show that no better than $3/2$, $8/7$, and $3/2$-approximation is possible (unless P=NP) for the 3 resource, 2 resource, and rank 3 variant, respectively. Both the approximation result for the interval case and the inapproximability result for the rank 3 variant are solutions to open challenges stated in previous works. Lastly, we also consider the reverse objective, that is, maximizing the minimal load any machine receives, and achieve similar results.

preprint2022arXivOpen access
0citations
0reviews
0saves
Nocode
Nodataset
0institutions

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.