Paper detail

Impacts of Distribution Network Reconfiguration on Aggregated DER Flexibility

The ongoing integration of controllable distributed energy resources (DER) makes distribution networks capable of aggregating flexible power and providing flexibility services at both transmission and distribution levels. The aggregated flexibility of an active distribution network (ADN) can be represented as its feasible operating area in the P-Q space. The limits of this area are pivotal for arranging flexibility markets and coordinating transmission and distribution system operators (TSOs and DSOs). However, motivated by the current technical limitations of distribution networks (e.g., protection schemes), existing literature on ADN flexibility and TSO-DSO coordination mostly focuses on radial networks, overlooking the potential benefits of network reconfiguration. This paper, using a realistic meshed distribution system from the UK and the exact ACOPF model for flexibility estimation, demonstrates that network reconfiguration can increase the limits of ADN aggregated flexibility and improve the economic efficiency of flexibility markets.

preprint2023arXivOpen access
0citations
0reviews
0saves
Nocode
Nodataset
0institutions

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.