Paper detail

High Multiplicity Scheduling with Switching Costs for few Products

We study a variant of the single machine capacitated lot-sizing problem with sequence-dependent setup costs and product-dependent inventory costs. We are given a single machine and a set of products associated with a constant demand rate, maximum loading rate and holding costs per time unit. Switching production from one product to another incurs sequencing costs based on the two products. In this work, we show that by considering the high multiplicity setting and switching costs, even trivial cases of the corresponding "normal" counterparts become non-trivial in terms of size and complexity. We present solutions for one and two products.

preprint2015arXivOpen access

Signal facts

What is known right now

Open access4 authors1 topic

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.