Paper detail

Higgs Factory and 100 TeV Hadron Collider: Opportunity for a New World Laboratory within a Decade

Suggestions have been made for a 80-100 km circumference Future Circular Collider (FCC) that could ultimately contain a circular e+e- ring collider operating as a Higgs Factory as well as a 100 TeV hadron collider. Those suggestions have motivated us to propose an approach in which the project is sited at the location at the SSC tunnel, which has the lowest tunnel cost ever. The low tunnel cost would make it cost-effective to locate the 100 TeV Hadron Collider in a 270 km circumference tunne, using 4.5 Tesla superconducting magnets. The SSC tunnel itself would be used to house the Higgs Factory and the injector for the Hadron Collider. The injector for the Higgs Factory would be also used as a driver for an X-ray Free Electron Laser with unique capabilities for protein crystallography. The location of the project at a location with favorable geotechnology for minimum-cost tunneling, and low-cost/low-risk technology for the SRF and superconducting magnets, open the possibility to build the proposed laboratory within a decade.

preprint2014arXivOpen access

Signal facts

What is known right now

Open access10 authors1 topic

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.