Paper detail

HAT-P-13: a multi-site campaign to detect the transit of the second planet in the system

A possible transit of HAT-P-13c has been predicted to occur on 2010 April 28. Here we report on the results of a multi-site campaign that has been organised to detect the event. CCD photometric observations have been carried out at five observatories in five countries. We reached 30% time coverage in a 5 days interval centered on the suspected transit of HAT-P-13c. Two transits of HAT-P-13b were also observed. No transit of HAT-P-13c has been detected while the campaign was on. By a numerical experiment with 10^5 model systems we conclude that HAT-P-13c is not a transiting exoplanet with a significance level from 65% to 72%, depending on the planet parameters and the prior assumptions. We present two times of transit of HAT-P-13b ocurring at BJD 2455141.5522 +- 0.0010 and BJD 2455249.4508 +- 0.0020. The TTV of HAT-P-13b is consistent with zero within 0.001 days. The refined orbital period of HAT-P-13b is 2.916293 +- 0.000010 days.

preprint2010arXivOpen access

Signal facts

What is known right now

Open access13 authors1 topic

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.