Paper detail

General Iteration graphs and Boolean automata circuits

This article is set in the field of regulation networks modeled by discrete dynamical systems. It focuses on Boolean automata networks. In such networks, there are many ways to update the states of every element. When this is done deterministically, at each time step of a discretised time flow and according to a predefined order, we say that the network is updated according to block-sequential update schedule (blocks of elements are updated sequentially while, within each block, the elements are updated synchronously). Many studies, for the sake of simplicity and with some biologically motivated reasons, have concentrated on networks updated with one particular block-sequential update schedule (more often the synchronous/parallel update schedule or the sequential update schedules). The aim of this paper is to give an argument formally proven and inspired by biological considerations in favour of the fact that the choice of a particular update schedule does not matter so much in terms of the possible and likely dynamical behaviours that networks may display.

preprint2011arXivOpen access

Signal facts

What is known right now

Open access1 author1 topic

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.