Paper detail

Fully dynamic maximal matching in O(log n) update time

We present an algorithm for maintaining maximal matching in a graph under addition and deletion of edges. Our data structure is randomized that takes O(log n) expected amortized time for each edge update where n is the number of vertices in the graph. While there is a trivial O(n) algorithm for edge update, the previous best known result for this problem for a graph with n vertices and m edges is O({(n+ m)}^{0.7072})which is sub-linear only for a sparse graph. For the related problem of maximum matching, Onak and Rubinfield designed a randomized data structure that achieves O(log^2 n) amortized time for each update for maintaining a c-approximate maximum matching for some large constant c. In contrast, we can maintain a factor two approximate maximum matching in O(log n) expected time per update as a direct corollary of the maximal matching scheme. This in turn also implies a two approximate vertex cover maintenance scheme that takes O(log n) expected time per update.

preprint2016arXivOpen access

Signal facts

What is known right now

Open access3 authors1 topic

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.