Estimating Multiple Step Shifts in a Gaussian Process Mean with an Application to Phase I Control Chart Analysis

preprint2014arXivOpen access

Abstract

In preliminary analysis of control charts, one may encounter multiple shifts and/or outliers especially with a large number of observations. The following paper addresses this problem. A statistical model for detecting and estimating multiple change points in a finite batch of retrospective (phase I)data is proposed based on likelihood ratio test. We consider a univariate normal distribution with multiple step shifts occurred in predefined locations of process mean. A numerical example is performed to illustrate the efficiency of our method. Finally, performance comparisons, based on accuracy measures and precision measures, are explored through simulation studies.

Explore this paper’s authors, topics and related work.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Reviews 0

Write a reviewWrite

No reviews yet.

Discussion 0

Add a commentWrite

No comments yet.