Paper detail

Energy Storage as Public Asset

Energy storage has exhibited great potential in providing flexibility in power system to meet critical peak demand and thus reduce the overall generation cost, which in turn stabilizes the electricity prices. In this work, we exploit the opportunities for the independent system operator (ISO) to invest and manage storage as public asset, which could systematically provide benefits to the public. Assuming a quadratic generation cost structure, we apply parametric analysis to investigate the ISO's problem of economic dispatch, given variant quantities of storage investment. This investment is beneficial to users on expectation. However, it may not necessarily benefit everyone. We adopt the notion of marginal system cost impact (MCI) to measure each user's welfare and show its relationship with the conventional locational marginal price. We find interesting convergent characteristics for MCI. Furthermore, we perform $k$-means clustering to classify users for effective user profiling and conduct numerical studies on both prototype and IEEE test systems to verify our theoretical conclusions.

preprint2020arXivOpen access
0citations
0reviews
0saves
Nocode
Nodataset
0institutions

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.