Paper detail

Electricity Pooling Markets with Strategic Producers Possessing Asymmetric Information II: Inelastic Demand

In the restructured electricity industry, electricity pooling markets are an oligopoly with strategic producers possessing private information (private production cost function). We focus on pooling markets where aggregate demand is represented by a non-strategic agent. Inelasticity of demand is a main difficulty in electricity markets which can potentially result in market failure and high prices. We consider demand to be inelastic. We propose a market mechanism that has the following features. (F1) It is individually rational. (F2) It is budget balanced. (F3) It is price efficient, that is, at equilibrium the price of electricity is equal to the marginal cost of production. (F4) The energy production profile corresponding to every non-zero Nash equilibrium of the game induced by the mechanism is a solution of the corresponding centralized problem where the objective is the maximization of the sum of the producers' and consumers' utilities. We identify some open problems associated with our approach to electricity pooling markets.

preprint2014arXivOpen access

Signal facts

What is known right now

Open access2 authors1 topic

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.