Abstract
In this paper, we present a heuristic procedure for designing a loop material flow pattern on a given facility layout with the aim of minimizing the total material handling distances. We present an approximation of the total material handling costs and greatly drop the required computational time by minimizing the approximation instead of the original objective function.
Connections
Explore this paper’s authors, topics and related work.
Building this map preview
BZPEER is loading the nearby papers, people, topics and institutions for this page.
Reviews 0
Write a review
No reviews yet.
Discussion 0
Add a comment
No comments yet.