Paper detail

Coordination protocol for inter-operator spectrum sharing in co-primary 5G small cell networks

We consider spectrum sharing between a limited set of operators having similar rights for accessing spectrum. A coordination protocol acting on the level of the Radio Access Network (RAN) is designed. The protocol is non-cooperative, but assumes an agreement to a set of negotiation rules. The signaling overhead is low, and knowledge of competitor's channel state information is not assumed. No monetary transactions are involved; instead, spectrum sharing is based on a RAN-internal virtual currency. The protocol is applicable in a scenario of mutual renting and when the operators form a spectrum pool. The protocol is reactive to variations in interference and load of the operators, and shows gains in a simulated small cell scenario compared to not using any coordination protocol.

preprint2015arXivOpen access
0citations
0reviews
0saves
Nocode
Nodataset
0institutions

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.