Paper detail

Chains-into-Bins Processes

The study of {\em balls-into-bins processes} or {\em occupancy problems} has a long history. These processes can be used to translate realistic problems into mathematical ones in a natural way. In general, the goal of a balls-into-bins process is to allocate a set of independent objects (tasks, jobs, balls) to a set of resources (servers, bins, urns) and, thereby, to minimize the maximum load. In this paper, we analyze the maximum load for the {\em chains-into-bins} problem, which is defined as follows. There are $n$ bins, and $m$ objects to be allocated. Each object consists of balls connected into a chain of length $\ell$, so that there are $m \ell$ balls in total. We assume the chains cannot be broken, and that the balls in one chain have to be allocated to $\ell$ consecutive bins. We allow each chain $d$ independent and uniformly random bin choices for its starting position. The chain is allocated using the rule that the maximum load of any bin receiving a ball of that chain is minimized. We show that, for $d \ge 2$ and $m\cdot\ell=O(n)$, the maximum load is $((\ln \ln m)/\ln d) +O(1)$ with probability $1-\tilde O(1/m^{d-1})$.

preprint2010arXivOpen access
0citations
0reviews
0saves
Nocode
Nodataset
0institutions

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.