Paper detail

Beam Position-Phase Monitors for SNS Linac

Electromagnetic modeling with MAFIA of the combined beam position-phase monitors (BPPMs) for the Spallation Neutron Source (SNS) linac has been performed. Time-domain 3-D simulations are used to compute the signal amplitudes and phases on the BPPM electrodes for a given processing frequency, 402.5 MHz or 805 MHz, as functions of the beam transverse position. Working with a summed signal from all the BPPM electrodes provides a good way to measure accurately the beam phase. While for an off-axis beam the signal phases on the individual electrodes can differ from those for a centered beam by a few degrees, the phase of the summed signal is found to be independent of the beam transverse position inside the device. Based on the analysis results, an optimal BPPM design with 4 one-end-shorted 60-degree electrodes has been chosen. It provides a good linearity and sufficient signal power for both position and phase measurements, while satisfying the linac geometrical constrains and mechanical requirements.

preprint2000arXivOpen access

Signal facts

What is known right now

Open access1 author1 topic

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.