Assessing Risk in Costing High-energy Accelerators: from Existing Projects to the Future Linear Collider

High-energy accelerators are large projects funded by public money, developed over the years and constructed via major industrial contracts both in advanced technology and in more conventional domains such as civil engineering and infrastructure, for which they often constitute one-off markets. Assessing their cost, as well as the risk and uncertainty associated with this assessment is therefore an essential part of project preparation and a justified requirement by the funding agencies. Stemming from the experience with large circular colliders at CERN, LEP and LHC, as well as with the Main Injector, the Tevatron Collider Experiments and Accelerator Upgrades, and the NOvA Experiment at Fermilab, we discuss sources of cost variance and derive cost risk assessment methods applicable to the future linear collider, through its two technical approaches for ILC and CLIC. We also address disparities in cost risk assessment imposed by regional differences in regulations, procedures and practices.

preprint2012arXivOpen access
0citations
0reviews
0saves
Nocode
Nodataset
0institutions

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.