Paper detail

Applying Stochastic Network Calculus to 802.11 Backlog and Delay Analysis

Stochastic network calculus provides an elegant way to characterize traffic and service processes. However, little effort has been made on applying it to multi-access communication systems such as 802.11. In this paper, we take the first step to apply it to the backlog and delay analysis of an 802.11 wireless local network. In particular, we address the following questions: In applying stochastic network calculus, under what situations can we derive stable backlog and delay bounds? How to derive the backlog and delay bounds of an 802.11 wireless node? And how tight are these bounds when compared with simulations? To answer these questions, we first derive the general stability condition of a wireless node (not restricted to 802.11). From this, we give the specific stability condition of an 802.11 wireless node. Then we derive the backlog and delay bounds of an 802.11 node based on an existing model of 802.11. We observe that the derived bounds are loose when compared with ns-2 simulations, indicating that improvements are needed in the current version of stochastic network calculus.

preprint2010arXivOpen access

Signal facts

What is known right now

Open access1 author1 topic

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Authors

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.