Paper detail

An entropy admissible time splitting scheme for a conservation law model of manufacturing system

This paper deals with a splitting method applied to a conservation law model of manufacturing system incorporating yield loss. A splitting scheme has been proposed. The yield loss term is treated by solving implicitly an ordinary differential equation and the hyperbolic part is approximated by a finite volume scheme. Bounded variation stability has been studied. Due to yield loss, proposed scheme is total variation bounded. The convergence of the numerical solution towards entropy solution (in the Kruzkov sense) is proved. Numerical experiments are presented to demonstrate the performance of the scheme.

preprint2014arXivOpen access

Signal facts

What is known right now

Open access1 author1 topic

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.