Paper detail

A quantitative analysis of the effect of flexible loads on reserve markets

We propose and analyze a day-ahead reserve market model that handles bids from flexible loads. This pool market model takes into account the fact that a load modulation in one direction must usually be compensated later by a modulation of the same magnitude in the opposite direction. Our analysis takes into account the gaming possibilities of producers and retailers, controlling load flexibility, in the day-ahead energy and reserve markets, and in imbalance settlement. This analysis is carried out by an agent-based approach where, for every round, each actor uses linear programs to maximize its profit according to forecasts of the prices. The procurement of a reserve is assumed to be determined, for each period, as a fixed percentage of the total consumption cleared in the energy market for the same period. The results show that the provision of reserves by flexible loads has a negligible impact on the energy market prices but markedly decreases the cost of reserve procurement. However, as the rate of flexible loads increases, the system operator has to rely more and more on non-contracted reserves, which may cancel out the benefits made in the procurement of reserves.

preprint2014arXivOpen access

Signal facts

What is known right now

Open access4 authors2 topics

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.